Spa-grade retreats,
built to
last.
A bathroom remodel lives or dies on what you can’t see — waterproofing, substrate, and slope, executed correctly the first time.
Get a Free QuoteFrom powder rooms to primary suites, we’ve delivered bathroom remodels across Los Angeles and Ventura Counties for more than 30 years. Every install is waterproofed, permitted, and inspected under California license #1094201.
Every project,
scoped in writing.
- 01Layout & FixturesReworking the footprint for walk-in showers, freestanding tubs, and real storage.
- 02Custom Vanities & StorageBook-matched stone tops, integrated lighting, and cabinetry built to the room.
- 03Tile & StoneFull-height marble, porcelain, and mosaic work, templated and set by hand.
- 04Waterproofing & PlumbingMembrane systems behind every wet wall, and fixtures relocated to code.
- 05Heated Flooring & VentilationRadiant floor systems and properly vented exhaust, sized to the room.
- 06Finishes & FitHardware, glass, paint, and a final walkthrough before the job is closed out.
The same sequence,
every time.
- 01
Consultation & Site Visit
We walk the space with you, take measurements, and talk through how you use it today and what you need it to do. This visit is free and carries no obligation.
- 02
Design & Scope
We develop the plan and a written scope of work, and settle materials before anything is signed. You see exactly what is and isn’t included.
- 03
Permits & Pre-Construction
We submit drawings, pull the permits required by your city or county, and order long-lead items around their lead times.
- 04
Demolition & Rough-In
Protection goes down, demolition happens, and structural, plumbing, and electrical changes are completed and inspected.
- 05
Installation & Finishes
Cabinetry, stone, tile, flooring, fixtures, and finishes follow in sequence, each trade handed off cleanly to the next.
- 06
Walkthrough & Close-Out
We walk the finished space with you, build and complete a punch list, and hand over warranty documentation.
Questions,
answered honestly.
Your contract is built on a defined scope, not a rough estimate — every material, fixture, and labor line is priced before we break ground. If something outside that scope turns up once work starts, you get a written change order with the exact cost before anything proceeds, never a surprise on the final invoice.
We build your schedule around the real LA permitting and inspection calendar, not a best-case guess, so the date you sign off on already accounts for plan-check and inspection wait times. If something outside our control pushes it, you hear about it the same week — not the week the deadline passes.
You get a single point of contact for the entire job, not a rotating cast of subs to chase down. We check in with you daily — by phone and by message — so you're never finding out about a problem after it's already cost you time.
Every job closes with a walkthrough and a written punch list — nothing is “done” until every item on it is fixed and you've signed off. We stand behind our work with the guarantee spelled out in your contract, and every trade that requires a license gets a licensed sub, not unlicensed labor to save a day.
We pull permits for anything LA requires a permit for, full stop, even when a smaller scope makes it tempting to skip. That protects you two ways: the city inspects the work as a second set of eyes beyond ours, and you're never the one holding an unpermitted addition when it's time to sell.
Yes — converting a tub to a shower almost always means moving or adding drain and supply lines, plus new waterproofing behind the wall, which requires a plumbing permit and inspection under LA's building code. Skipping it isn't a shortcut — it's exactly the kind of unpermitted work that surfaces at a home inspection when you go to sell.
Yes — plumbing code requires at least 15 inches of clearance from the center of the toilet to any wall or fixture on either side, and at least 21 inches of clear space in front of it. We confirm this during design, before any fixture is ordered, so there's no surprise when it's time to install.
If it's inside the wall we're already opening as part of your scope, it gets remediated and documented with a written change order before any new tile or waterproofing goes up — code won't let us close up a wall over damaged material regardless. It's addressed as part of doing the job right, not used as an upsell.
Ready to start
your bathroom remodeling?
A free, no-obligation consultation. We respond within 24 hours.
Get a Free Quote